Chisholm Creek Wastewater Pollution Control Facility

Oklahoma City, Oklahoma

For the expansion of the City of Oklahoma City’s existing Chisholm Creek Wastewater Pollution Control Facility, Poe & Associates partnered with Camp Dresser & McKee, Inc. (CDM). The facility was expanded from 5MG to 10MGD. Poe’s services included the following tasks:

  • Site survey of the existing facilities to include the depth of structures and hydraulic profile of all the existing structures.
  • Development of existing site plan and proposed site plan drawings to include yard piping.
  • Development of the geometric site plan and site grading plan drawings.
  • Design of replacing the existing wastewater plant yard piping with new and larger piping to service the existing and expanded wastewater facility.
  • Design of new 36-inch force mains to transfer wastewater from the main lift station to the wastewater treatment facility head works and to the wastewater holding pond.

Construction Cost – $12 million
Completion – 2011

Client:

City of Oklahoma City
420 W. Main, Suite 500
Oklahoma City, OK 73102

Project Team:

Back